|
|
|
My garage was OUT OF CONTROL so I decided it needed a douching. Carmine said he would help me and it should take up about 4 hours to unload the garage, tear down the existing shelves, construct the new metal Gorilla shelves, reorganize, and reload everything. Here's how it looked before I started at about 10am. From the driveway. Close-up left side. Extreme close-up right side. Close-up right side. Extreme close-up right side (that's a pool "pillow") it's time to get the pool covered. Here's where my wooden shelves used to be and now what my Gorilla shelves look like (before I filled them). 1pm and 1:45pm respectivly. Here's what the driveway looked like with the garage neat. Notice it's dark out! This is 9pm. These last 4 were about midnight. I know it doesn't look like we accomplished ANYTHING but it actually looks MUCH better and way more organized. I think another full day and we'll be in good shape.
This page was last updated on: 11/12/2008 |